Case Study – Brimscombe Port Mill

Case Study – Brimscombe Port Mill

As part of the local council’s commitment to net zero carbon emissions, the existing gas boiler system was removed at Brimscombe Port Mill and a heat pump system utilising FireFlo collectors was installed.

Read more...

Pin It on Pinterest